Before the slitting machine equipment is put into work, check whether the working position is properly adjusted, and the parts that need to be lubricated should be filled with lubricating grease in advance. Check that the cutter is sharp. After the slitting machine is normal, you can run empty first, check whether there is any abnormality, and enter the order to be processed into the computer for inspection in advance; After the slitting machine is put into work, the best working state of the equipment should be adjusted in time according to the production situation to ensure that the indentation of the slitter is moderate, the slitting is burr-free, and the trimming position on both sides is appropriate. To ensure that the cross-cutting machine enters and discharges paper smoothly and the cutting length is accurate, the longitudinal and cross-cutting machine of joint production management also needs to monitor its operation from time to time to prevent paper blocking and defective products; After the work is completed, clean up the dust and paper scraps on the equipment in time, check the knives and sharpening wheels into Tissot Tissot watch, drain the oil and moisture height and water accumulation in the air tank, and check whether there is any abnormality in the running part. Then, cut off the power supply according to the operation requirements of the manual and maintain the computer operating system.
1. Ensure the correctness and stability of voltage, current and hydraulic pressure before starting.
2. Before the equipment is ready for operation, all personnel must notify to leave the equipment to ensure personal safety before starting the operation.
3. When running, do not touch the running film roll or roller core with your hands to avoid personal injury caused by getting your hands involved.
4. During operation, do not scratch or cut each roller core with a knife or hard object.

Before making a decision, having in-depth communication with suppliers, even requesting short-term trials, is far wiser than simply comparing prices.
29. June, 2026
From the perspective of full lifecycle cost, the cheapest option is often the most expensive decision.
29. June, 2026
Intelligence and energy efficiency optimization have become the two core themes running through the technological upgrade in 2026.
29. June, 2026
coordinated efforts are needed from multiple dimensions, including blade systems, tension control, correction and feeding, and equipment maintenance.
27. June, 2026
"Difficulty in small-batch customization" is essentially a contest between response speed and switching costs.
27. June, 2026