Reducing slitter downtime requires both preventative maintenance and quick repairs, and here are the systematic solutions:

First, preventive maintenance system (80% failure can be prevented)
1. Life management of key components
◦ Establish a periodic table for replacement of wear parts (e.g., inserts are replaced every 500 hours, bearings are lubricated every 2000 hours)
◦ Real-time condition monitoring of the spindle/gearbox using a vibration monitor
2. Standardization of daily spot checks
◦ Make a daily pre-start-up checklist (including 15 items such as air pressure, belt tension, tool alignment, etc.)
◦ Periodic monitoring of motor/drive temperature with infrared thermometer
3. Intelligent early warning system
◦ Install PLC fault code automatic push system (SMS/sound and light alarm)
◦ Trend analysis of historical failure data (e.g., the average life of a certain type of bearing is 1875 hours)

Second, rapid response to maintenance plans
1. Fault Tree Analysis (FTA) application
◦ Establish a decision tree for common faults of the slitter (such as uneven winding→ insufficient air pressure (70%)/photoelectric eye offset (30%))
◦ Equipped with a rapid diagnostic kit (including laser alignment instrument, thickness detector, etc.)
2. Modular spare parts strategy
◦ Reserve key components (e.g. complete tension control module, replacement time reduced from 4 hours to 30 minutes)
◦ Implementation of ABC classification inventory management (Category A is for high-frequency demand parts such as tool holder components)
3. The ability of the maintenance team is improved
◦ Conduct special training on FMEA (Failure Mode Analysis).
◦ "10-minute quick mold change" labor competition is held every quarter

Third, in-depth improvement measures
1. Root Cause Analysis (RCA)
◦ 5 Why analysis for repetitive faults (e.g., frequent film breaks→ tension fluctuations→ cylinder leaks→ non-matching seal materials)
2. Error-proofing design
◦ Color code management is used in the air joint
◦ Mechanical overload protection device is installed
3. OEE Improvement Plan
◦ Monitor continuous improvement with MTTR (Mean Time to Repair) and MTBF (Mean Time Between Failures).
Fourth, the implementation of template tools
1. Preventive maintenance calendar (including QR code scanning and check-in)
2. Troubleshooting SOP video library (including VR simulation fault)
3. Spare parts 3D model catalogue (including disassembly and assembly torque parameters)
What to expect:
• More than 60% reduction in unplanned downtime
• 40% reduction in average repair time
• Overall Equipment Effectiveness (OEE) increased by 15-20%
It is recommended to perform a Pareto analysis of the fault data in the last 12 months, focusing on the top 3 fault types (usually accounting for 70% of the downtime). At the same time, a maintenance knowledge base is established to realize the digital inheritance of experience.

Precisely cut the wide master roll according to the preset dimensions, then rewind it into finished rolls suitable for subsequent processing or direct use.
09. December, 2025
Cut wide rolls of film, paper, nonwoven fabric, metal foil, and other materials to precise sizes, and then rewind them into finished rolls that meet downstream requirements.
09. December, 2025
A slitting rewinder is a device that slices wide coils into multiple narrow strips of material and rewinds them into independent rolls.
09. December, 2025
An advanced slitting machine is like a powerful "invisible heart", continuously delivering precise, efficient, and healthy blood to the printing plant's hot stamping capabilities.
08. December, 2025
These devices integrate precision machinery, automatic control, and intelligent inspection technology to achieve fully automated processing from coils to finished products.
08. December, 2025